
All Case Studies


Case Study
How Stonescapes Made the Ultimate Upgrade from Pen and Paper with Assignar

Case Study
How OE Construction Answers the Why Questions

Case Study
Infraworks: Timesheets, Compliance, & Insights

Case Study
Load 28: Faster, More Accurate Timesheets

Case Study
TZ Civil: From Paper Forms to Real-Time Feedback

Case Study
Non Destructive Excavations: Moving on from Spreadsheets

Case Study
Hi-Range Crane Forks: Scaling Requires Operations Platform

Case Study
Blacktown Waste Services: Saving 80% on Payroll Time

Case Study
CJ’s Demolition: Mobility Out of the Office

Case Study
Duron Atlantic: Scaling from 30 to 100 Employees

Case Study
Jim’s Electric: Saving a Full Day on Payroll

Case Study
Aaction Traffic: Moving to a Digital Solution
We have used Assignar in our bigger tenders and won them, and I do think that having Assignar has been an advantage.

Case Study
Abletech Underground Group: Saving 2 Hours Per Day

Case Study
Transforming Operations and Safety Management at Aussie Excavators Plant Hire

Case Study
Active Crane Hire uses Assignar to manage the maintenance of over 170 tower cranes
We have saved 1-2 weeks in the data collection and approval process of service dockets.

Case Study
Sunraysia Crane and Rigging

Case Study
Mann Group uses Assignar to improve job costing and efficiency

Case Study
Allroad Group uses Assignar to operate without a central asset depot and increased efficiency by 60%

