Claim every dollar of work you’ve done, the month you do it.

Turn your bid into a schedule of values, let progress from the field drive each pay application, and track retainage line by line. No more building claims from exported timesheets and spreadsheets.

Example pay application built from a schedule of values

Pay application #4

Civil works, lump sum

Pay application #4
ItemScheduled valueThis period
Mobilization Previously claimed: 100%. Progress this period: 0%.$45,000$0
Bulk earthworks Previously claimed: 55%. Progress this period: 17%.$380,000$64,600
Stormwater drainage Previously claimed: 30%. Progress this period: 18%.$265,000$47,700
Pavement and curb Previously claimed: 0%. Progress this period: 10%.$310,000$31,000
Demobilization Previously claimed: 0%. Progress this period: 0%.$20,000$0
Previously claimedProgress this period
Work completed to date
$476,800
Retainage held (10%)
−$47,680
Previously certified
−$300,150
Amount due this period
$128,970

Hard-bid billing is where earned margin waits to be collected.

On lump-sum work, the job can be on budget and still hurt cash flow. The gap is between what the crew has finished and what finance has claimed.

  • Claims are built by hand every month

    Someone exports timesheets, pivots them against the contract and checks each line in a spreadsheet. It takes days, and it happens outside the system the work was recorded in.

  • Finished work goes unbilled

    If progress on site doesn’t reach the office before the claim date, that work waits for next month. You’ve paid for the labor and equipment already. The cash just hasn’t arrived.

  • Rejected claims delay payment

    Over-claim a line, miscalculate retainage or send the wrong format and the claim comes back. Every resubmission pushes your payment further out.

From bid to certified claim, in one workflow.

Estimating, the field and finance work from the same schedule of values, so the claim reflects the work as it happened.

  1. Start from the bid

    Upload your bid or build it in Assignar. AI reads the items and structure, and the bid becomes the job’s schedule of values.

  2. Report progress from the field

    Crews and supervisors report progress against the work items as it happens, not at the end of the month.

  3. Close the billing period

    Each line shows percent complete, previously claimed and this period, with retainage held and released calculated for you.

  4. Send the pay application

    Turn the billing period into a payment claim, printed as an AIA G702/G703 or a branded schedule of values PDF.

  5. Track certification

    Record what your client certifies, and every line carries the remaining balance forward to the next claim.

See earned-but-unbilled work before the claim date.

Because your schedule of values is connected to job costing, every line shows what it’s worth, how far along it is and how much you’ve billed.

  • Billed and unbilled by line. A line that’s 48% complete but only 30% billed shows exactly what’s left to claim.
  • Guardrails on quantities. Mark bid quantities as estimates or not-to-exceed, and Assignar warns you before anything is invoiced over the agreed amount.
  • Extras on the same invoice. Bill worker time, equipment and materials alongside your schedule of values lines.
Example earned versus billed view

Earned vs billed, before claim #4

Example view

Earned vs billed, before claim #4
ItemCompleteBilled to dateUnbilled
Bulk earthworks72%$209,000$64,600
Stormwater drainage48%$79,500$47,700
Pavement and curb10%$0$31,000
Ready to claim
$143,300

Illustrative data, matching the pay application above.

Lump sum and rates, on the same platform.

Most contractors don’t bill one way. Assignar handles both methods from the same bid, so you don’t need a separate tool for each.

Schedule of Values

For hard-bid and lump-sum contracts

Bill by percent complete against an agreed contract value, with progress claims, retainage and certification.

Schedule of Rates

For time and materials and unit rates

Bill hours, equipment and quantities at agreed rates, matched automatically from timesheets and daily records.

Not another standalone billing tool.

Schedule of Values in Assignar is connected to how you win, plan, run and get paid for work, so progress in the field shows up as cash, not just a status update.

  • Win

    Your bid’s items and pricing become the schedule of values. Nothing gets retyped.

  • Plan

    Orders and crews are set up from the bid, tied to the same work items.

  • Operate

    Progress reported in the field rolls up to each line, alongside actual labor and equipment cost.

  • Pay

    Pay applications, retainage and certification run from live progress, so you claim faster and more accurately.

Send claims in the format your client expects.

Print a pay application as an AIA G702/G703, the standard many general contractors require from specialty subcontractors. Or send a branded schedule of values PDF with your own logo and layout.

Built for self-perform contractors on hard-bid work.

Heavy civil, earthworks, utilities and specialty subcontractors use Schedule of Values to bill fixed-price work by progress, and Schedule of Rates for the time and materials work that comes with it.

See Schedule of Values on one of your jobs.

We’ll take one of your bids from schedule of values to pay application, with retainage and a G702/G703 at the end.