Asset Maintenance in Assignar

Get machines serviced fast, and see what they really cost you.

Faults reported from the field turn into repair work orders. Down machines drop off the schedule automatically. Every hour of labor and every part lands against the asset, so maintenance cost shows up while you can still act on it, not at month-end.

OUT OF SERVICE

Raised from this morning’s pre-start

Asset
25t crawler crane
Fault
Hydraulic leak, boom ram
Status
Down
Work order
Assigned to mechanic
Scheduling
Blocked until repaired

Photos, priority and the operator’s notes travel with the work order.

Watch the walkthrough

From fault report to back on the job

See how a defect raised in the field becomes a repair work order, takes the machine off the schedule, and lands every labor hour and part against the asset.

Book a demo

The maintenance gap

Maintenance is where equipment margin quietly leaks out.

Most contractors aren’t short on effort in the workshop. They’re short on visibility between the field, the workshop and the office.

  • Faults get lost between the field and the workshop

    A defect written on a paper pre-start can sit in a truck for days. By the time the fitter hears about it, a small fix has become a big repair.

  • Broken machines still get booked

    When the scheduler can’t see that a machine is down, crews arrive on site to an asset that can’t work. That’s lost hours, a frustrated client and a scramble for a replacement.

  • Repair costs hide in the totals

    Mechanic hours and parts get lumped into overheads, so nobody can say which machines cost the most to keep running until the month is already closed.

One connected workflow

From first report to back on the job, in one workflow.

Field, workshop and scheduling work from the same record, so everyone knows the state of every machine.

  1. Report the fault

    Operators raise a fault directly or straight from an inspection or pre-start checklist, with photos and notes attached.

  2. Mark it down

    A machine marked Down is blocked from scheduling, so nobody books it onto a job by mistake.

  3. Raise a work order

    Create a repair work order and assign it to your own mechanics or an outside repairer.

  4. Record the repair

    Log labor and materials against the work order as the repair progresses, so the cost is captured at the source.

  5. Back in service

    Close the work order and the machine returns to the schedule, with the full repair history kept on the asset.

Know which machines are earning their keep.

When every repair hour and part is tied to the asset, the numbers that matter are already there.

  • Maintenance history per asset. Every fault, work order and repair in one place.
  • Fleet maintenance cost. See where repair spend is going across the fleet, not buried in overheads.
  • Utilization alongside cost. Spot the machines that cost the most to keep running and work the least.

Example view

Fleet maintenance, last 90 days

AssetStatusWork ordersRepair cost
25t crawler craneDown6$18,420
30t excavatorIn service3$10,860
Water cartRepair open2$6,240
Tipper truckIn service1$2,390
Illustrative data. Bars show each asset’s share of fleet repair cost.

Not another standalone maintenance app.

Maintenance in Assignar is connected to how you win, plan, run and get paid for work, so a breakdown in the field shows up everywhere it affects margin.

  • Win

    Price jobs knowing what your equipment really costs to run.

  • Plan

    Down machines are blocked from the schedule, so crews get assets that can work.

  • Operate

    Pre-starts, faults, work orders and repairs run from the field and the workshop.

  • Pay

    Repair labor and materials are captured against the asset, ready for cost reporting.

Stay ahead of inspections and expiring paperwork.

Track registrations, certificates and other asset documents with expiry warnings, so nothing lapses quietly. Import a machine’s maintenance plan and Assignar drafts the matching inspection and pre-start forms for your team to review and switch on.

Set required forms at the asset template level, and every machine of that type inherits them.

Once every maintenance hour was tied to a specific machine, the plant team could finally see true labor cost per asset, which machines were driving the most effort, and how much time was going to travel and delays instead of tools.
Plant department lead, Australian rail maintenance contractor

See Asset Maintenance on your own fleet.

We’ll walk through a fault, a work order and a repair using equipment like yours.